Ask Sawal

Discussion Forum
Notification Icon1
Write Answer Icon
Add Question Icon

what is efu zoning?

2 Answer(s) Available
Answer # 1 #

You must also include a completed Contractor Responsibility Form with your application.

Electrical permits are applied for separately. You can find the Electrical Permit Application online.

If your plans include constructing an accessory structure (garage, patio cover or deck), Lane County has pre-approved plans available. View the pre-approved plans.

If you also plan to build a fence, please be aware of any height or setback requirements for visual clearance. Fences cannot be built in a road right-of-way. See the handout.

If you are placing a manufactured home on your property, you do not need to submit building plans; however, you must complete the Manufactured Home Installer Responsibility Form.

Before you can submit your application, you must meet with a Lane County Planner. (Find a time upriver or in town here.)

Once an application is submitted and confirmed as complete, a permit number is created and your application is routed for review.

Staff review the submitted application to ensure that all required elements have been included. If an element is missing, staff will contact you and request the missing pieces before your application can move to Step 4.

Your application is reviewed carefully by staff who specialize in planning, sanitation and building. If more information is needed a plans examiner will contact you.

If staff determine a significant amount of information is missing or land use applications are required, you will be asked to pick up your materials and resubmit a complete packet.

Permits are valid for 180 days. Each approved inspection renews the associated permit(s) for another 180 days.

The building packet you are issued will include inspection information.

Ensure your contractor has a valid Oregon CCB license.Beware of individuals that may try to take advantage of you during the rebuild process. Tips to avoid scams can be found at State of Oregon 'Buyers Beware' website. Be aware of the laws and codes for repairs. Visit the Oregon Building Codes Division for additional information.

There are a minimum of 11 inspections required for a dwelling. Inspections are also required for septic systems and manufactured dwellings.

[5]
Edit
Query
Report
Pierre-Wiliam Arch
Ghostwriter
Answer # 2 #

Article 7 of the HRC zoning regulations is titled “Exclusive Farm Use Zone” (EFU). It is the policy of Hood River County to preserve and maintain the county's agricultural lands for agricultural uses, consistent with existing and future farm practices.

[3]
Edit
Query
Report
Pradip Laha
SUPPOSITORY MOLDING MACHINE OPERATOR